Mansity Services LLC collaborates with international companies on engineering, procurement, and commissioning in oil and gas industries. Among our affiliates are Benkline Nig Ltd and Aequilibria Industrial Resources Nig. Ltd (AIRNL).
Engineering, Procurement, and Construction (EPC) Consulting
Our company Mansity Services LLC is an international business consultancy firm, located in the state of Georgia, USA. Our firm is working with a consortium, Benkline Nig Ltd, Aequilibria Industrial Resources Nig. Ltd (AIRNL), TMCH Group Ltd, and Innovative Pipeline Management Services (IPMS). The consortium is bidding to secure a project on engineering, procurement and construction (EPC) of ABURA OIL and GAS export pipelines. This procurement focuses on In-field line pipes. Our clients are EPC local company in Nigeria and do business with most of the IOC’s and marginal field operators.
Currently, our client has been asked to approach foreign manufacturers regarding putting up a frame supply and services agreement of your products and services that have been identified in a project for Nigerian Petroleum Development Company (NPDC) Limited. NPDC intends to carry out Engineering, Procurement and Construction (EPC) Project for Oil and Gas Export Pipelines and Procurement of In-Field Line Pipes at Abura in OML 65. To achieve the above objective, NETCO-JUBOB carried out Front End Engineering Design (FEED) for the Engineering, Procurement, Construction and Installation (EPCI) of the Project and came out with the following prospective:
The Contractor is expected to review and reconfirm preliminary simulation, layout, and other Front End Engineering Design (FEED) deliverables, during the detailed engineering design phase of the Works. The basis of the Works for the Project is provided within the Scope of Works and is divided into three packages as listed below:
- Package I: Engineering, Procurement and Construction (EPC) of 10″ x 8Km Sch. 80 PE Coated Oil Export Pipeline from Abura Flowstation to Tie-In Point on SPDC Utorogu Oil Export Pipeline
- Package II: Engineering, Procurement and Construction (EPC) of 6″ x 15Km Sch. 80 PE Coated Gas Export Pipeline from Abura Gas Handling Facility to Tie-In Point on NGC Pigging Facility at Utorogu
- Package III: Procurement of 3000 Joints of 4″ Sch. 80 PE Coated for Abura In-field Flowlines
- In light of the above project, Mansity Services LLC is seeking for manufacturers/product distributors that can partner with our consortium clients to supply required products and/or efficiently implement the contract in engineering, procurement, and commissioning in the oil and gas companies.
Mansity Services LLC as a US-based company will act as a mediator between the company and our consortium clients to facilitate the bidding and implementation of the project. As a manufacturer or distributor of oil and gas products, in-field line pipes, and/or valves and measurements, please contact us.